The installation was performed during the annual. The roof lining had to be opened for inspection anyway, so replacing the senders took little time. Then electricity, not terrible as the electric panel is well done by Cessna, easily removed, and we found a free seat for the breaker. The first calibration was billed 4h of man power. The second was only supervised as i did the work, so 1h. Small...